Daily Archives: April 16, 2013

De Floor, de floor!

The concrete was poured on March 18th after six months of work by Alberto’s crew to remove the old concrete and dig out for the waffle boxes. Then the installation of the vapor barrier and the boxes, the insulation, the … Continue reading

Posted in Moisture Intrusion/Expansive Soil | Comments Off on De Floor, de floor!