First Two Doors

We brought in the two small closet doors because they were in the way in the garage. Well, they were in the way in the house too. I found these doors on Craigslist about 18 months ago. They were only … Continue reading

Posted in -Chronological Recent Posts, Reduce Reuse Recycle, Tools, Trim | Leave a comment

Fire Alarms

I finally got the fire alarms installed after having the item on multiple lists since the electrical was finished. I’m trying to check off all the requirements for our final inspection. LEED requires that we have a carbon monoxide alarm … Continue reading

Posted in -Chronological Recent Posts, Electrical, LEED Project, Trim | Leave a comment

Adding a Shower Light

The family room shower is big and it was dark inside. It really needed a light but I didn’t specify one in the electrical drawings so I had to add it as a retrofit. The light I bought came with … Continue reading

Posted in -Chronological Recent Posts, Electrical | Leave a comment

Radon Proof Sump Cover

When we demoed the slab floor we saw that drain pipes were connected from the outside perimeter foundation of the house into the sump tank. We seldom saw water in the sump tank so we were not sure the system … Continue reading

Posted in -Chronological Recent Posts, Moisture Intrusion/Expansive Soil, Radon Mitigation | Leave a comment

Ladder Pot Hanger Shelf

I have two of these old kiva ladders. They are popular in the Southwest and I like the look of them made out of logs and leather straps. I needed to use the 12′ ladder to help hang this ladder … Continue reading

Posted in -Chronological Recent Posts, Design Style, Kitchen, Reduce Reuse Recycle | Leave a comment