Monthly Archives: February 2018

Pine Log Haul

I have a habit of checking craigslist for log items. I want to use pine logs for the trim in the house. I’m hoping to create a Colorado rustic lodge look. I missed out on some log siding from Evergreen … Continue reading

Posted in -Chronological Recent Posts, Construction, Finishes, Reduce Reuse Recycle, Trim | Leave a comment

Shower Floor

On the last day of Bill’s visit the tile saw pump connection broke. It could have frozen as the temperature dropped from the 60’s to below freezing overnight. We couldn’t keep the water line connected so we stopped cutting tiles … Continue reading

Posted in -Chronological Recent Posts, Bathrooms, Tile | Leave a comment

Shower Tile Design

This was a big week. Two shower designs were laid out and one shower was almost completed. Bill Boyd is our tile guy and also our nephew in law. Unfortunately he lives in California. But he agreed to come out … Continue reading

Posted in -Chronological Recent Posts, Bathrooms, Plumbing, Tile, Tools | Leave a comment

Solar Thermal Plans

I have been wanting to install solar thermal panels to help heat the hot tub water since the hot tub is the major draw on our electrical power. We have prime sunshine and solar hot water heaters were very popular … Continue reading

Posted in -Chronological Recent Posts, Plumbing, Reduce Reuse Recycle, Solar, Spa | Comments Off on Solar Thermal Plans