We Get a Shed

Here is something new. A shed purchased as a kit and put together by a store contractor. Our kids ordered it for us and had it built, although they will use it for a couple of years. And it certainly … Continue reading

Posted in -Chronological Recent Posts, Construction, Landscape | Comments Off on We Get a Shed

Tesla Solar!

The solar photovoltaics were installed yesterday and “commissioned” today. I’m thrilled. This seems like another major step in the process of putting together a truly energy efficient home. And it is another case of purchasing a complete system with installation … Continue reading

Posted in -Chronological Recent Posts, Electrical, Energy Efficiency, Solar | Comments Off on Tesla Solar!

Solar System Commissioned

Commissioning was basically a test of functions. I had the Tesla app open on my phone so I could follow along with the tests. The commissioning was early in the morning so the system was not yet producing full power. … Continue reading

Posted in -Chronological Recent Posts, Electrical, Monitoring, Solar | Comments Off on Solar System Commissioned

Passed the Final Inspection

April Fools!  But we did have the inspector come out at the end of February and we are very close. We had three things that needed to be done to pass: first, finish the showers; second, caulk around the bathroom … Continue reading

Posted in -Chronological Recent Posts, Electrical, Inspections, Plumbing | Comments Off on Passed the Final Inspection

Winter Tent Worked

I was distracted from building projects by preparing for our spring trip to the Grand Canyon with the family. We have a small RV that fits us and the grandkids just fine but the rest of the family did not … Continue reading

Posted in -Chronological Recent Posts, Distractions | Comments Off on Winter Tent Worked

Rustic Bathroom Door

We are having guests at the end of the week. I thought it would be great to have a real door on the master bathroom now that the shower is also completed. I even used the shower before our trip … Continue reading

Posted in -Chronological Recent Posts, Bathrooms, Trim | Comments Off on Rustic Bathroom Door

Painted Garage Door

I  was surprised that our garage door was so shy. I had to look long and hard for any photos of the door before it was painted. This is how it looked when we bought the house. There was always … Continue reading

Posted in -Chronological Recent Posts, Maintenance and Repair, Reduce Reuse Recycle | Comments Off on Painted Garage Door

If It’s On A List, Then It Must Get Done

Sooner or later the list must get done. It is past time to come up with a Spring list and I’m looking at the items that I have paid no attention to for a season and feeling like I had … Continue reading

Posted in -Chronological Recent Posts, Kitchen, Maintenance and Repair, Planning | Comments Off on If It’s On A List, Then It Must Get Done

Solar is Up! Day One

Yesterday the Xcel technician stopped by about 4 PM to install the solar meter. That completed the setup for our solar system. She gave me a hang tag that said the system was ready to bring online! After she left … Continue reading

Posted in -Chronological Recent Posts, Electrical, Energy Efficiency, Solar | Comments Off on Solar is Up! Day One

UltimateAir ERV WiFi Control

It has been just over a year since I last tried to hook up the ERV to a WiFi dimmer. But with my son’s advice and encouragement the deed was finally accomplished. He designed a circuit for me to convert … Continue reading

Posted in -Chronological Recent Posts, Electrical, Ventilation | Comments Off on UltimateAir ERV WiFi Control

New Toilets

I was tired of looking at and trying to clean the old biscuit colored toilet in the back bathroom. It flushed fine with its 1.6 gallon flush–a water saver in its day. But the tank and the bowl were stained … Continue reading

Posted in -Chronological Recent Posts, Bathrooms, LEED Project, Plumbing | Comments Off on New Toilets

More ERV Controls

I spent another day on ERV controls. It is unbelievable that these controls are taking so much time. I was gratified that I finally got the variable speeds to work with the Lutron Caseta wifi dimmer and the GRX-TVI control … Continue reading

Posted in -Chronological Recent Posts, Electrical, Ventilation | Comments Off on More ERV Controls

Tesla Solar First Month Report

On the occasion of our first utility bill after adding solar, we found a significant reduction in the cost of the electricity we consumed from the grid. As the Tesla engineers predicted the solar provided about half of our electricity … Continue reading

Posted in -Chronological Recent Posts, LEED Project, Monitoring, Solar | Leave a comment