Dirt Can’t Hide (From Intensified Digging)

Excavation resumed after the plumbing was dug out. The goal was 16 1/2 inches down from the top of slab or about a foot of digging throughout. The first few inches were completed before the plumbing was dug out, just 4 1/2 more inches to go!

Digging down 24" at the foundation

Digging down 24″ at the foundation

Dirt removed from the living area

Dirt removed from the living area–waffle box is marking the depth needed.

Family room bath and back corner

Family room bath and back corner

Utility room

Utility room sump pit dug out.

More digging in center of house

More digging in center of house

Last area left in front of the door.

Last area left in front of the door.

Where did all this dirt go? The workers took wheelbarrows of it out to the back yard. To be eventually be used for fill.