Daily Archives: March 29, 2013

Really Rebar

The engineering plan from Crown Jade uses rebar instead of post tensioning cable to reinforce the concrete in the floor. The computer program that the engineers used to design the floor system was a Post Tensioning Insitute product. Post Tensioning … Continue reading

Posted in Moisture Intrusion/Expansive Soil | Comments Off on Really Rebar