Monthly Archives: January 2013
Crown Jade Engineering Drawings
Mark Benjamin of Crown Jade Engineering delivered the final plan for the Waffle Mat system just was the plastic vapor barrier was being installed. The plan is engineered with the PSI concrete standards using a PSI computer program that took … Continue reading
Posted in Moisture Intrusion/Expansive Soil, Planning, Project Team
Comments Off on Crown Jade Engineering Drawings
Structured Plumbing
We are interested in wasting as little water as possible and to that end, we designed a structured plumbing system that allows for the hot water to circulate within a loop system of pipes to deliver hot water at the … Continue reading
Posted in Construction, House Systems, LEED Project, Planning, Plumbing
Comments Off on Structured Plumbing