Yearly Archives: 2013

Insulstar!

Quite a bit of time went into researching the insulation for under the slab. The engineers were concerned about the insulation holding up to the stresses that the wafflemat would be mitigating. Apparently no other customers of Wafflemat had required … Continue reading

Posted in Air Intrusion/Thermal Envelope, Construction, Energy Efficiency, House Systems | Comments Off on Insulstar!

Crown Jade Engineering Drawings

Mark Benjamin of Crown Jade Engineering delivered the final plan for the Waffle Mat system just was the plastic vapor barrier was being installed. The plan is engineered with the PSI concrete standards using a PSI computer program that took … Continue reading

Posted in Moisture Intrusion/Expansive Soil, Planning, Project Team | Comments Off on Crown Jade Engineering Drawings

Structured Plumbing

We are interested in wasting as little water as possible and to that end, we designed a structured plumbing system that allows for the hot water to circulate within a loop system of pipes to deliver hot water at the … Continue reading

Posted in Construction, House Systems, LEED Project, Planning, Plumbing | Comments Off on Structured Plumbing