Drywall Prep: Install Membrane Progress

We are making good progress on the membrane installation. The first area was to finish the wiring chase with insulation, polyiso and then the membrane seen installed here.

Wiring Chase Membrane

Wiring Chase Membrane

The wiring chase included some tricky areas around the radon pipe where the ceiling height changes.

Ceiling Membrane around Radon Pipe

Ceiling Membrane around Radon Pipe

Second was to work on the master bedroom which was finished a couple of days ago. Then I moved on to the master bedroom door, the patio doors and the south facing corners of the house.

South Dining/Kitchen Corner

South Dining/Kitchen Corner

South Patio Doors Membrane

South Patio Doors Membrane

The last project of the day was to install the membrane around the front door at the air lock entry.

Front Door Entrance

Front Door Entrance

There are two large areas left: The west wall of the entry at the garage, and the west wall of the family room. Then I can work on boxing in the radon pipe at the stairs and finishing the membrane in the upper storage closet.