If one room at a time was the plan, then the whole room would have to be demolished, including removing the concrete floor, the next step was renting a huge air compressor and jackhammer to get the floor out. Immediately had to return the 90 lb. hammer and trade for the 60 lb. which I could barely handle. After several days of short sessions of rat-a-tat-tatting, it was clear that the work was too brawny and brains would have to intercede. The emphasis turned to going beyond the first room to tackle the larger project by first removing the living room woodstove and breaking up the platform before the jackhammer and air compressor were returned. The $500 brawn experiment was mostly successful because it required a decision to change course.
-
Categories
- ►-Recent Posts
- ►Construction
- ▼Deconstruction
- A Summer of Deconstruction
- Back at the Ranch
- Bagster Truck
- Bare Bones
- Brawn vs. Brains
- Cabinet Instead
- Deconstruction--Step One
- Deconstruction--Step Two
- Dirt Can't Hide (From Intensified Digging)
- Door Warranty Prep
- Dropping the Attic
- Fireplace Boiler System Re-design
- Floating Walls
- Goodbye Fiberglass (Mostly)
- Hornets' Nest! @#&!
- Hot Town in the Summertime
- Interesting Original Construction Details
- Into the Void (Our Caisson Foundation)
- Labor Day Labors (Plus 10 days)
- Laminate Bathroom Floor
- Late September Reinforcements!
- Midsummer's Dreams
- Nature's Warriors
- On Beyond Zebra (i.e. first notions)
- Rear Bathroom Gut Job
- The Most Difficult Door
- The Trouble at the Bottom..... (Pete Seeger)
- ►Design Style
- ►Diversions
- ►Energy Efficiency
- ►House Systems
- ►Landscape
- ►LEED Project
- ►Maintenance and Repair
- ►Planning
- ►Project Team
- ►Reduce Reuse Recycle
- ►Tools
- ►-Recent Posts