As required by LEED, the outer shell must be fully sealed. All the sills, corners and rafters were recaulked–most were caulked on the original build but there were a few gaps.
Much of the Roxul rock wool was installed before the move. Two layers of 5.5″ in the ceiling and one layer of 5.5″ in the walls–R 46 and R 23 respectively.
Although some areas are not yet filled, there is quite a bit of insulation left. We estimate we over ordered about 6 23″ bales and maybe 3-4 16″ bales.