Before Move
Before we moved to the new house–from purchase in January 2012 to completed move in May, 2014
-
-
Front window thermal image
-
-
Sun streaming into living room
-
-
Hiking the Maztazal Wilderness
-
-
Satellite View
-
-
Condo baseboards
-
-
Clean Cabinets
-
-
Survey of lot lines
-
-
Front Windows plus one East facing window
-
-
Two North facing windows
-
-
One West facing window
-
-
East West Axis
-
-
South facing roof
-
-
Range hood removed
-
-
Another view of the kitchen leftovers after the donation.
-
-
Peeking behind the drywall on the south window wall.
-
-
Experimental hole in concrete
-
-
Revealing kitchen plumbing
-
-
Bathroom cabinet removal
-
-
Getting started
-
-
Bathroom break
-
-
Closet caving
-
-
Six inch wall between bedroom and living area
-
-
Offing drywall
-
-
Walls come tumbling down
-
-
Joshua would be proud
-
-
Removing heavy (!) shower base
-
-
Demo progress in late June
-
-
Trying out new wall layout
-
-
Can we do it?
-
-
Jackhammer blues
-
-
Small progress in master bath
-
-
More heavy lifting–moving cast iron stove
-
-
Demo of stove platform
-
-
Drywall tearout
-
-
Serious deconstruction
-
-
Bagster trash
-
-
Joined beams–interesting details uncovered.
-
-
Opened spaces
-
-
Post and Beam–twisted, maybe recycled beam was furred out for drywall beam.
-
-
Block wall is thick but does not seem to hold up the rafters
-
-
More debris hauling
-
-
The pile of studs grows higher.
-
-
Studs for recycling and drywall debris for the bagster.
-
-
Piles of drywall debris
-
-
The Rubbish Works truck’s boom arm moving bagster bag
-
-
The bagster truck reaching for the first bag.
-
-
Everyone loves a big truck!
-
-
Dead tree removal
-
-
Dragging branches to pile
-
-
Tree too close to house
-
-
Firewood for the future
-
-
Cleared out and cleaned
-
-
Extra time left to remove lights
-
-
It was just a few days of help but it made a huge difference.
-
-
Dibble Res_FP SD2_12-0507
Floor plan design in May–not enough room for a full bath off the airlock entry.
-
-
Dibble Res_FP SD2_12-0507–revised.
My suggested changes to the May plan.
-
-
-
Starting with the concrete in the master bath.
-
-
Guys at work with the jack-hammer.
-
-
First day is done
-
-
More concrete removal, the front had no mesh but the rear of the house did!
-
-
Concrete removed from the front area of the house
-
-
Utility Room and Kitchen area
-
-
Concrete rubble will be used for future rubble wall construction
-
-
More concrete removed
-
-
Embedded wood stringers have rotted at the bottom from the moisture.
-
-
Sensors in the Slab
-
-
Outside work, the broken front patio, a leaning wall, and the stoop were also removed.
-
-
Waffle Mat in sets
-
-
Waffle Mat being setup.
-
-
Waffle Mat with rebar detail
-
-
Waffle Mat with plumbing rough in.
-
-
Old bath, laundry, and floor drain pipes
-
-
Pipe Length meets Width–all three inches
-
-
Old kitchen sink drain
-
-
Hole in pipe
-
-
Cracked and rotted pipe
-
-
Pipe cracked at exit through foundation
-
-
Rotted pipe easily broke off
-
-
Master Bath Pipes–upper end pipes were still solid.
-
-
Junction of pipe from crawlspace and master bath
-
-
Master bath shower pipe
-
-
Crawlspace pipe
-
-
Digging down 24″ at the foundation
-
-
Dirt removed from the living area–waffle box is marking the depth needed.
-
-
Family room bath and back corner
-
-
Utility room sump pit dug out.
-
-
More digging in center of house
-
-
Last area left in front of the door.
-
-
Void Space under wall
-
-
Close up of Void
-
-
Rotted void cardboard
-
-
Honeycomb roof of the void
-
-
Tar paper and foam on the outside
-
-
Concrete wall from underside
-
-
Another close up
-
-
Void emptied of heaved dirt
-
-
Wall above excavated void
-
-
Corner of void and caisson
-
-
Insulation in front of void
-
-
Insulation to 24″ at ground level foundation
-
-
Insulation behind new sewer pipes-more on the sewer to come!
-
-
Plumbing Diagram Basement Revised for master bath
-
-
Plumbing attached to existing
-
-
-
Drain layout based on the finalized floor plan, shows drain pipe sizes.
-
-
Just drains.
-
-
Master bath drains and vents.
-
-
Family bath and laundry drains and vents.
-
-
Kitchen and bar sink connections.
-
-
Master bath tub wall plumbing shown on architect elevation.
-
-
Family room bath with plumbing layout for drains and vents.
-
-
Kitchen and utility sink plumbing shown on architect elevation.
-
-
Another view of the kitchen with plumbing drains and vents.
-
-
Laundry drain from utility room.
-
-
Master bath toilet, sink, shower wall plumbing shown on architect elevation.
-
-
Slab Pex Sample
-
-
Solar Heat Source
-
-
Polish fireplace boiler pipe layout
-
-
Spectra Fireplace Boiler
-
-
Pex layout for radiant heat
-
-
Wet vented master bath drains
-
-
Laundry and family room bath drains
-
-
Another view of the family bath and laundry drains
-
-
Outdoor drain cleanout
-
-
Pipe bedded in fine gravel
-
-
Tub Overflow
-
-
Flooded bedroom floor
-
-
Water leaking outside
-
-
Dibble Res_Kiva Plan_12-1127
-
-
Dibble Res_Kiva View_12-1127
-
-
Sample Kiva
-
-
Mediterranean Style Kiva
-
-
Extended Kiva
-
-
Kiva box and frame
-
-
Permit approved
-
-
Master Bath Drains
-
-
Structured Plumbing Trunk Loop
-
-
Structured Plumbing Master Bedroom Loop
-
-
Waffle Box Installation
-
-
Spraying Insulstar on waffle boxes.
-
-
Insulation on Wafflemat
-
-
Insulation Truck
-
-
Insulation Truck Setup
-
-
Rebar order delivered
-
-
Edge work
-
-
Tying rebar
-
-
Rebar grid
-
-
Rebar at door
-
-
Terrible Tangle
-
-
First run produced large tangle
-
-
Concrete Pump Hose
-
-
Ready for concrete
-
-
Huge concrete truck
-
-
Starting the slab
-
-
Section one complete
-
-
Waiting for the last truck
-
-
Goodbye cement truck
-
-
Finishing up
-
-
Power trowel
-
-
Finishing the front stoop
-
-
Alberto and the finished product
-
-
Celebrating cement
-
-
Captured in time
-
-
Resting in the sun
-
-
Another view of shower location in the master bath.
-
-
Old kitchen drain location. Possible wet bar indoors and/or outdoor sink.
-
-
Garage water supply next stop in the loop.
-
-
Water supply pipes where they enter the loop system under the slab.
-
-
Cold only supply for outdoor faucet.
-
-
Tub location in master bath.
-
-
Shower and Sink location in master bath.
-
-
Pex Water Supply Loop
-
-
Tremendous Tangle
-
-
Zone Three
-
-
Manifold Connections
-
-
Zones 1 & 2 and Plan
-
-
Zone One Another View
-
-
Zone 3 Another View
-
-
Zones 4 & 5
-
-
Crimped Pex
-
-
Zone 4 Partial with 1, 2, & 3
-
-
Zone 4 and 5 with Plumbing
-
-
Zone 5
-
-
Zone 4
-
-
Manifold Layout
-
-
Zone One
-
-
Zone One with Plumbing–no attempt was made to give extra clearance near pipes.
-
-
Gap between Zones 1 & 2
-
-
Motorcycle stand vertical holder for Pex.
-
-
Radon Mitigation Pipe
-
-
Manifold close up after pour.
-
-
Boiler Without Cover
-
-
Ford Super Duty
-
-
8′ Truck Bed
-
-
Denver Magazine Green Roofs-7-10
-
-
Snow on the front terrace
-
-
Snow drifted on the north and west
-
-
Electrical Box Snow Cap
-
-
Washing out the truck
-
-
Connection to the old vent stack
-
-
Air supply and flue to concentric vent
-
-
Completed flue
-
-
Challenger Boiler DHW Piping for Install
-
-
Challenger Boiler System Piping for Install 3rd drawing
-
-
Baby Poop Color Stain
-
-
Same color but Coffee Au Lait
-
-
Color faded a bit when etched over
-
-
Shutterfly book title page
-
-
Slab edge 1
-
-
Slab edge 2
-
-
Sanitred Liquid Rubber Base
-
-
Master Cool Evap Cooler
-
-
Evaporative Cooler Install
-
-
Historic photo of the Old Faithful Inn at Yellowstone
-
-
Hickory Coffee Table
-
-
Hickory Couch
-
-
Hickory Hall Table
-
-
Hickory Love Seat
-
-
Hickory Round Table
-
-
Hickory TV Cabinet
-
-
Utility Room Floor
-
-
Second coat of brown stain
-
-
Stained floor brown overlay
-
-
Streaks in floor
-
-
Seal coat
-
-
Sealer beaded up too
-
-
House Awnings
-
-
Tarp not quite long enough
-
-
Stapled on the framework
-
-
Sanitred pulled away from edge
-
-
Mang Ox Filter Ready to Load
-
-
Filter Installed
-
-
Mang Ox Install Media and Parts
-
-
Well Water Entry and Pressure Tank Hookups
-
-
Drain and Chlorine Tank
-
-
Dense Pack and Batt Insulation
-
-
Used 3.5.inch polyiso
-
-
Loose Fill Insulation
-
-
Intact Attic
-
-
Higher attic ceiling
-
-
Bagging the loose fill
-
-
Bagging the loose fill
-
-
Attic rafters and scaffold
-
-
Scaffold holding attic rafters
-
-
Attic rafters dropped
-
-
Upper attic wall to go
-
-
Attic opened up
-
-
First Family with Ellen
-
-
The Case of the Shrinking Efficiency Rating
-
-
Hydronic testing
-
-
Horizontal Connections
-
-
Domestic Hot Water
-
-
Hole 2 made by the birds
-
-
-
-
Insulation Piles
-
-
Another view of a hole
-
-
Hole in foam insulation
-
-
Ideal same construction wall, slab and roof
-
-
Ideal wall, roof and floor
-
-
USA Wall System
-
-
Patched siding
-
-
Bird Hole Location
-
-
Decrease in pipe size
-
-
Increase in pipe size
-
-
Sample gas run
-
-
Our gas run
-
-
Gas Pipe Sizing
-
-
Tearing Down in Family Room
-
-
Workers set up for tear down
-
-
Tear down living room ceiling
-
-
Tear down cleaned up
-
-
Two Story Scaffolding
-
-
Final Tear Down Bath/Family Room
-
-
Utility Room Tear Out
-
-
Discarded batts
-
-
Sacked batts
-
-
Saved batts
-
-
Roll off Dumpster
-
-
Bird Damage Removed
-
-
Repaired Bird Hole
-
-
Eternabond Flashing Tape
-
-
Flashing Tape
-
-
The Solution
-
-
Closeup of the Northern Flicker
-
-
Buckled Flashing
-
-
Separation of Seal
-
-
Rotting Flashing Trim
-
-
Buckling flashing and Rotting Trim
-
-
Dangerous Drywall
-
-
“Paper” Hornets
-
-
Nest Flip Side
-
-
Destroyed Nest
-
-
Fortklift cannot cross a threshold.
-
-
Pallets of Insulation
-
-
Stored inside
-
-
Grandson Trucking Roxul
-
-
Clerestory
-
-
Rock Wool Clerestory
-
-
Rock Wool Closet
-
-
Rock Wool Ceiling
-
-
Rock Wool Excess
-
-
Blown in Insulation
-
-
Blown in at Eaves
-
-
Plastic vapor barrier on warm side
-
-
Sealed at the eaves
-
-
Layers of Fiberglass batt
-
-
Interior wall Insulation
-
-
Two layers of batts
-
-
Hot water recirc
-
-
Blue Recirc Pump
-
-
Single Loop System
-
-
New Challenger Boiler Piping
-
-
Primary Secondary System
-
-
Valves Uncovered
-
-
Original Boiler Setup
-
-
Valve Flow
-
-
Wiring Core in Living Area
-
-
Main wiring chase
-
-
Wiring Branches
-
-
Insulated Wiring Core
-
-
Start of unloading the moving truck
-
-
Small uhaul trailer for things that we left behind the first time.