Before we moved to the new house–from purchase in January 2012 to completed move in May, 2014
- Front window thermal image
- Sun streaming into living room
- Hiking the Maztazal Wilderness
- Satellite View
- Condo baseboards
- Clean Cabinets
- Survey of lot lines
- Front Windows plus one East facing window
- Two North facing windows
- One West facing window
- East West Axis
- South facing roof
- Range hood removed
- Another view of the kitchen leftovers after the donation.
- Peeking behind the drywall on the south window wall.
- Experimental hole in concrete
- Revealing kitchen plumbing
- Bathroom cabinet removal
- Getting started
- Bathroom break
- Closet caving
- Six inch wall between bedroom and living area
- Offing drywall
- Walls come tumbling down
- Joshua would be proud
- Removing heavy (!) shower base
- Demo progress in late June
- Trying out new wall layout
- Can we do it?
- Jackhammer blues
- Small progress in master bath
- More heavy lifting–moving cast iron stove
- Demo of stove platform
- Drywall tearout
- Serious deconstruction
- Bagster trash
- Joined beams–interesting details uncovered.
- Opened spaces
- Post and Beam–twisted, maybe recycled beam was furred out for drywall beam.
- Block wall is thick but does not seem to hold up the rafters
- More debris hauling
- The pile of studs grows higher.
- Studs for recycling and drywall debris for the bagster.
- Piles of drywall debris
- The Rubbish Works truck’s boom arm moving bagster bag
- The bagster truck reaching for the first bag.
- Everyone loves a big truck!
- Dead tree removal
- Dragging branches to pile
- Tree too close to house
- Firewood for the future
- Cleared out and cleaned
- Extra time left to remove lights
- It was just a few days of help but it made a huge difference.
- Dibble Res_FP SD2_12-0507 Floor plan design in May–not enough room for a full bath off the airlock entry.
- Dibble Res_FP SD2_12-0507–revised. My suggested changes to the May plan.
- Starting with the concrete in the master bath.
- Guys at work with the jack-hammer.
- First day is done
- More concrete removal, the front had no mesh but the rear of the house did!
- Concrete removed from the front area of the house
- Utility Room and Kitchen area
- Concrete rubble will be used for future rubble wall construction
- More concrete removed
- Embedded wood stringers have rotted at the bottom from the moisture.
- Sensors in the Slab
- Outside work, the broken front patio, a leaning wall, and the stoop were also removed.
- Waffle Mat in sets
- Waffle Mat being setup.
- Waffle Mat with rebar detail
- Waffle Mat with plumbing rough in.
- Old bath, laundry, and floor drain pipes
- Pipe Length meets Width–all three inches
- Old kitchen sink drain
- Hole in pipe
- Cracked and rotted pipe
- Pipe cracked at exit through foundation
- Rotted pipe easily broke off
- Master Bath Pipes–upper end pipes were still solid.
- Junction of pipe from crawlspace and master bath
- Master bath shower pipe
- Crawlspace pipe
- Digging down 24″ at the foundation
- Dirt removed from the living area–waffle box is marking the depth needed.
- Family room bath and back corner
- Utility room sump pit dug out.
- More digging in center of house
- Last area left in front of the door.
- Void Space under wall
- Close up of Void
- Rotted void cardboard
- Honeycomb roof of the void
- Tar paper and foam on the outside
- Concrete wall from underside
- Another close up
- Void emptied of heaved dirt
- Wall above excavated void
- Corner of void and caisson
- Insulation in front of void
- Insulation to 24″ at ground level foundation
- Insulation behind new sewer pipes-more on the sewer to come!
- Plumbing Diagram Basement Revised for master bath
- Plumbing attached to existing
- Drain layout based on the finalized floor plan, shows drain pipe sizes.
- Just drains.
- Master bath drains and vents.
- Family bath and laundry drains and vents.
- Kitchen and bar sink connections.
- Master bath tub wall plumbing shown on architect elevation.
- Family room bath with plumbing layout for drains and vents.
- Kitchen and utility sink plumbing shown on architect elevation.
- Another view of the kitchen with plumbing drains and vents.
- Laundry drain from utility room.
- Master bath toilet, sink, shower wall plumbing shown on architect elevation.
- Slab Pex Sample
- Solar Heat Source
- Polish fireplace boiler pipe layout
- Spectra Fireplace Boiler
- Pex layout for radiant heat
- Wet vented master bath drains
- Laundry and family room bath drains
- Another view of the family bath and laundry drains
- Outdoor drain cleanout
- Pipe bedded in fine gravel
- Tub Overflow
- Flooded bedroom floor
- Water leaking outside
- Dibble Res_Kiva Plan_12-1127
- Dibble Res_Kiva View_12-1127
- Sample Kiva
- Mediterranean Style Kiva
- Extended Kiva
- Kiva box and frame
- Permit approved
- Master Bath Drains
- Structured Plumbing Trunk Loop
- Structured Plumbing Master Bedroom Loop
- Waffle Box Installation
- Spraying Insulstar on waffle boxes.
- Insulation on Wafflemat
- Insulation Truck
- Insulation Truck Setup
- Rebar order delivered
- Edge work
- Tying rebar
- Rebar grid
- Rebar at door
- Terrible Tangle
- First run produced large tangle
- Concrete Pump Hose
- Ready for concrete
- Huge concrete truck
- Starting the slab
- Section one complete
- Waiting for the last truck
- Goodbye cement truck
- Finishing up
- Power trowel
- Finishing the front stoop
- Alberto and the finished product
- Celebrating cement
- Captured in time
- Resting in the sun
- Another view of shower location in the master bath.
- Old kitchen drain location. Possible wet bar indoors and/or outdoor sink.
- Garage water supply next stop in the loop.
- Water supply pipes where they enter the loop system under the slab.
- Cold only supply for outdoor faucet.
- Tub location in master bath.
- Shower and Sink location in master bath.
- Pex Water Supply Loop
- Tremendous Tangle
- Zone Three
- Manifold Connections
- Zones 1 & 2 and Plan
- Zone One Another View
- Zone 3 Another View
- Zones 4 & 5
- Crimped Pex
- Zone 4 Partial with 1, 2, & 3
- Zone 4 and 5 with Plumbing
- Zone 5
- Zone 4
- Manifold Layout
- Zone One
- Zone One with Plumbing–no attempt was made to give extra clearance near pipes.
- Gap between Zones 1 & 2
- Motorcycle stand vertical holder for Pex.
- Radon Mitigation Pipe
- Manifold close up after pour.
- Boiler Without Cover
- Ford Super Duty
- 8′ Truck Bed
- Denver Magazine Green Roofs-7-10
- Snow on the front terrace
- Snow drifted on the north and west
- Electrical Box Snow Cap
- Washing out the truck
- Connection to the old vent stack
- Air supply and flue to concentric vent
- Completed flue
- Challenger Boiler DHW Piping for Install
- Challenger Boiler System Piping for Install 3rd drawing
- Baby Poop Color Stain
- Same color but Coffee Au Lait
- Color faded a bit when etched over
- Shutterfly book title page
- Slab edge 1
- Slab edge 2
- Sanitred Liquid Rubber Base
- Master Cool Evap Cooler
- Evaporative Cooler Install
- Historic photo of the Old Faithful Inn at Yellowstone
- Hickory Coffee Table
- Hickory Couch
- Hickory Hall Table
- Hickory Love Seat
- Hickory Round Table
- Hickory TV Cabinet
- Utility Room Floor
- Second coat of brown stain
- Stained floor brown overlay
- Streaks in floor
- Seal coat
- Sealer beaded up too
- House Awnings
- Tarp not quite long enough
- Stapled on the framework
- Sanitred pulled away from edge
- Mang Ox Filter Ready to Load
- Filter Installed
- Mang Ox Install Media and Parts
- Well Water Entry and Pressure Tank Hookups
- Drain and Chlorine Tank
- Dense Pack and Batt Insulation
- Used 3.5.inch polyiso
- Loose Fill Insulation
- Intact Attic
- Higher attic ceiling
- Bagging the loose fill
- Bagging the loose fill
- Attic rafters and scaffold
- Scaffold holding attic rafters
- Attic rafters dropped
- Upper attic wall to go
- Attic opened up
- First Family with Ellen
- The Case of the Shrinking Efficiency Rating
- Hydronic testing
- Horizontal Connections
- Domestic Hot Water
- Hole 2 made by the birds
- Insulation Piles
- Another view of a hole
- Hole in foam insulation
- Ideal same construction wall, slab and roof
- Ideal wall, roof and floor
- USA Wall System
- Patched siding
- Bird Hole Location
- Decrease in pipe size
- Increase in pipe size
- Sample gas run
- Our gas run
- Gas Pipe Sizing
- Tearing Down in Family Room
- Workers set up for tear down
- Tear down living room ceiling
- Tear down cleaned up
- Two Story Scaffolding
- Final Tear Down Bath/Family Room
- Utility Room Tear Out
- Discarded batts
- Sacked batts
- Saved batts
- Roll off Dumpster
- Bird Damage Removed
- Repaired Bird Hole
- Eternabond Flashing Tape
- Flashing Tape
- The Solution
- Closeup of the Northern Flicker
- Buckled Flashing
- Separation of Seal
- Rotting Flashing Trim
- Buckling flashing and Rotting Trim
- Dangerous Drywall
- “Paper” Hornets
- Nest Flip Side
- Destroyed Nest
- Fortklift cannot cross a threshold.
- Pallets of Insulation
- Stored inside
- Grandson Trucking Roxul
- Clerestory
- Rock Wool Clerestory
- Rock Wool Closet
- Rock Wool Ceiling
- Rock Wool Excess
- Blown in Insulation
- Blown in at Eaves
- Plastic vapor barrier on warm side
- Sealed at the eaves
- Layers of Fiberglass batt
- Interior wall Insulation
- Two layers of batts
- Hot water recirc
- Blue Recirc Pump
- Single Loop System
- New Challenger Boiler Piping
- Primary Secondary System
- Valves Uncovered
- Original Boiler Setup
- Valve Flow
- Wiring Core in Living Area
- Main wiring chase
- Wiring Branches
- Insulated Wiring Core
- Start of unloading the moving truck
- Small uhaul trailer for things that we left behind the first time.