Labor Day Labors (Plus 10 days)

The walls fall away and begin to reveal the amazing interior spaces of the house. It was fun getting to this point but there is still a lot to get done before the floor can come out.

Opened spaces

Opened spaces

Post and Beam

Post and Beam–twisted, maybe recycled beam was furred out for drywall beam.

Block wall

Block wall is thick but does not seem to hold up the rafters

More debris hauling

More debris hauling

The pile of studs grows higher

The pile of studs grows higher.

Studs for recycling and drywall debris for the bagster.

Studs for recycling and drywall debris for the bagster.

Piles of drywall debris

Piles of drywall debris

This entry was posted in Deconstruction, Reduce Reuse Recycle. Bookmark the permalink.